Start a project→

QUALITY / BUILT INTO PROCESS

Quality control & product validation.

Prevention, monitoring, validation and traceability form a closed loop for consistent motion, lots and programs.

CONTROL PLAN / QUALITY GATES

Five gates from material to delivery.

Control plans develop with product and process, translating critical characteristics into inspection, equipment settings and records.

  1. 01

    Incoming inspection

    Material, critical dimensions and supplier-lot verification

  2. 02

    First-piece approval

    First-piece control after line, tooling and startup changes

  3. 03

    In-process control

    Ongoing monitoring of critical process, appearance and function

  4. 04

    Final inspection

    Every finished product receives 100% functional inspection before packing

  5. 05

    Outbound release

    Verification of lot, packing, labels and release records

CERTIFICATION / COMPLIANCE

Certification scope must match the product.

Management-system and product certifications are shown separately. UL, VDE and CCC scope varies by model, voltage and customer program; certificate documents and applicability lists are available for project review.

ISO

ISO 9001

Quality management system

SYSTEM CERTIFICATION
UL

UL

Product and component scope

MODEL-SPECIFIC
VDE

VDE

Electrical safety scope

MODEL-SPECIFIC
CCC

China Compulsory Certification

China compulsory product scope

MODEL-SPECIFIC

Review the certificate holder, production site, certificate number, covered models and current validity against the issuing body’s records.

Request certificates and model applicability→

VALIDATION / CAPABILITY

Proving design and process with data.

The Ningbo laboratory validates electrical safety, mechanical output, noise, temperature rise, endurance and environmental performance, extending test boundaries to customer standards.

ElectricalTorque & strokeTemperature & noiseEnduranceInsulationEnvironment

Agree the validation conditions

A program review checklist, rather than test results for a specific model. Request records for the model and program being reviewed.

CheckConditions to defineRecord
Electrical & insulationRated voltage, frequency, insulation class and test methodModel, method, instrument and result
Torque / stroke / outputLoad, direction, measurement position and temperatureOutput curve or measurement record
Temperature & noiseAmbient temperature, duty, load and measuring pointsStabilization conditions and readings
Endurance & environmentCycles, on/off duty, temperature, humidity and criteriaSample size, failure log and conclusion
100%

FINAL INSPECTION

Every finished product is functionally inspected before packing.

100% refers to final functional inspection under the model control plan before packing. Endurance and environmental validation use the sample size and conditions agreed for the program.

Start with the application. Co-engineer the next appliance component.

Make the next critical motion reliable.

Start a project→