Start a project→

STANDARDS & CERTIFICATION

Standards & certification notes

Official references and SUNTA selection notes. Confirm applicability against the model, customer standard and certification-body requirements.

LATEST UPDATE / EDITORIAL BRIEF

Brazil RoHS watch: prepare material and cable evidence early for appliance-component programs

On 23 September 2026, UL Solutions highlighted Brazil's CONAMA Resolution No. 516/2026, which establishes a hazardous-substance restriction framework for electrical and electronic equipment sold in Brazil. The resolution covers equipment as well as cables and spare parts used for repair, reuse or upgrades, with phased requirements by substance group; scope, exemptions and specific compliance responsibility must be confirmed against the CONAMA resolution, importer requirements and program documentation. For finished-appliance programs containing synchronous motors, stepper motors, drain actuators or lead sets, this is an early planning signal for export documentation and supply-chain traceability—not a RoHS or market-access claim for any SUNTA product.

SUNTA program review suggestions

  • At Brazil RFQ stage, have the finished-appliance brand or importer confirm scope, target placing-on-market date, and the required material declarations, test reports or supplier-attestation format; do not assume an EU RoHS file automatically satisfies a Brazil program.
  • For samples and mass-production introduction, maintain a part-number-to-material-to-supplier traceability list for motor insulation, leads/terminals, plastics, solder and purchased electronics, and assess documentation updates and customer review before changes.
  • Allow time in quotation and test plans for supply-chain collection and any needed verification. If a customer requests an exemption assessment, legal interpretation or market-access conclusion, have its Brazilian importer and qualified compliance adviser/certification body confirm it. This update does not state or imply Brazil RoHS, UL, VDE, CE, REACH or other approval for any model.

ARCHIVE / RECENT NOTES

More technical notes

Each update keeps the source context and SUNTA interpretation for quick review during RFQ, sampling, certification and production.

2026-09-17Standards watch

IEC 60335-2-9:2026 pre-release: review motor-and-heating combinations in portable cooking appliances early

IEC released the IEC 60335-2-9:2026 pre-release (FDIS) on 4 September 2026 for household and similar portable cooking appliances, including toasters, air fryers and portable ovens with forced-air circulation. The official change list includes portable air fryers, forced-air ovens and simultaneous activation of any combination of heating elements and motors. This is a pre-release document; the final adopted edition and its applicability must be confirmed case by case by the finished-appliance maker, target-market requirements and the certification body.

  • For air-fryer, countertop-oven or toaster RFQs, confirm the motor duty conditions before quotation: standalone running, operation during heating, stalled or abnormal conditions, and whether electronic control is involved.
  • Use the motor, fan/drive parts, leads, insulation system and thermal/control design as inputs to the finished-appliance thermal-safety review; component-level testing does not replace verification to the applicable end-product standard.
IEC — IEC 60335-2-9:2026 PRV, Edition 8.0 (4 Sep 2026) →
2026-09-09Export compliance

VDE highlights 2026 Korea appliance compliance: align KC, EMC, energy and environmental reviews

In its August 2026 Korea regulatory update, VDE highlights that appliance market access may require coordinated review of the KC safety route, EMC/wireless applicability, energy and hazardous-substance requirements, plus change reporting for derivative models and component substitutions. The applicable standards and approval route must be confirmed case by case with the importer, certification body and program documentation.

  • Before quoting a Korea program, confirm whether the finished appliance involves KC, EMC or wireless requirements and define the motor component documentation boundary.
  • At sample freeze, create a variance list for model, rated voltage, leads/terminals, insulation materials and control design; assess whether substitutions need customer or certification-body review before release.
VDE — 2026 Korea Household Appliance Regulatory Update (18 Aug 2026) →
2026-09-09Standards watch

IEC 60034-1:2026 update: rating and performance points for synchronous-motor programs

IEC published edition 15 of IEC 60034-1 in March 2026, replacing the 2022 edition. Its scope clarifies machines with integrated EMC-active components. The points below are SUNTA review suggestions; confirm applicability and the customer-required edition for each product.

  • Confirm the IEC edition referenced by the customer during RFQ to avoid mismatched certification and test criteria.
  • Keep rated voltage, frequency, output speed, temperature-rise and insulation-class records version controlled.
IEC 60034-1:2026 · Edition 15 (13 Mar 2026) →
2026-09-09Certification update

Review UL construction and certification scope before component changes

Motor certification is tied to specific models, construction, voltage, materials and applications. Export synchronous-motor programs should confirm certificate applicability and deviation lists at sample stage.

  • When VDE or UL is required, first verify whether the scope covers the exact model and technical change.
  • Material substitutions, lead wires, terminals, insulation systems and voltage platforms can trigger re-review.
UL Solutions — Follow-Up Services →

SOURCE WATCH / OFFICIAL SOURCES

Official references

Working with a specific certification or export-market requirement?

Send the model, voltage, target market and customer standard. SUNTA can help review certificate scope, test planning and documentation.

Request certification review→

Start with the application. Co-engineer the next appliance component.

Make the next critical motion reliable.

Start a project→